** Please be advised, the provided lead times are only estimates and are provided to us by the manufacturers. These estimates are subject to change based on the current demands and are updated as needed/provided. While we do tend to stock many components in-house, some lead times (*) will be based on component availability and lead times may be less. Please feel free to contact us prior to ordering for a check on inventory. 

VKS Fabrication: 3-5 weeks (once an order is placed, it cannot be cancelled, returned or refunded (unless there is a manufacturer defect) as these are built to order)
PRP Seats: 3-7 weeks (once an order is placed, it cannot be cancelled, returned or refunded (unless there is a manufacturer defect) as these are built to order)
Rock Hard 4x4: Smaller items/JK skids: 7-10 business days | cage kits & components: 4-6 weeks | bumpers/sliders/full skid systems: 6-12 weeks
Rock Krawler: 5-10 business days for individual items | 6-10 weeks for full kits *based on availability of components
Road Armor: 6-8 weeks *based on availability of components (orders cannot be cancelled after 48 hours of being placed)
Bartact: 6-7 weeks
Dynatrac Axles: 16-18 weeks
Cali Raised: 6-10 weeks (cancellation of orders once placed will result in a 15% cancellation fee)
ICON Vehicle Dynamics: 20-24 weeks *based on availability of components
Rock Slide Engineering: 10-12 weeks
LoD Offroad: 6-8 weeks
Nemesis Industries: 6-8 weeks *based on availability of components
Yukon Gear & Axle: Most items stocked in house- 2-3 weeks* based on availability of components
Baja Designs: 8 weeks *based on availability of components
Wheels: 2-3 weeks (beadlock / non-beadlock)  *based on brand and availability. Please contact us prior to ordering for a check on inventory 
Tires: 4-6 weeks (15's / 16's / 17's / 18's / 20's) *based on brand and availability. Please contact us prior to ordering for a check on inventory
RPM Steering: 10-21 business days *based on availability of components
Fox: 4-6+ week lead time *based on availability
Advanced Driveline Axles: 8-10 weeks
PowerTank CO2 Packages: Please contact us prior to ordering
HIDProjectors: 1 week or less
MetalCloak: 1-3 weeks *based on availability and component(s). (All Metalcloak orders must ship to Offroad Elements first and then to you)
AMP Research: 20-24 weeks from date of order (if on pre-order/not in stock at time of order)